Edmonson County School District
Technology Plan
ASSURANCE CERTIFICATION
Planning Years 2005-2009
I certify that to the best of my knowledge, the information contained in this application is correct and complete and that the agency named in this application has authorized me, as its representative, to obligate this agency to conduct any ensuing program or activity in accordance with all applicable Federal and State laws. It is understood that this application, once posted to our local district server for public access constitutes an offer, and if accepted by the Kentucky Department of Education or negotiated to acceptance, will form a binding agreement.
District Technology Coordinator Lamar Miller
LOCAL PROGRAM CONTACTS
Persons involved in planning |
Email of persons involved |
Telephone |
Lamar Miller, District Technology Coordinator |
270-597-9417 |
|
Brent Norris, Assistant Technology Coordinator |
270-597-9417 |
|
Alex Fitzpatrick, Professional Development Coordinator |
270-597-2101 |
TECHNOLOGY PLAN
EXECUTIVE SUMMARY
Mission Statement
“The staff of the Edmonson County School District accepts the responsibility to provide meaningful learning experiences that will enable all students to reach high levels of academic and non-academic performance, demonstrate positive social/emotional growth and become productive members of our society.”
We in the technology office believe these goals can be reached and that technology can assist in reaching these goals.
Technology planning process
The current technology department consists of Lamar Miller and Brent Norris. Having only a 2-person department makes it very difficult to maintain over 1000 network devices including servers, workstations, network routers and switches, wireless access devices, printers, scanners, and projectors, along with other items such as phones and phone switches, A/V Equipment and Uninterruptible Power Supplies. It does, however make us aware of all aspects of our network. Having redesigned the network from the ground up within just the past 2 years, we know our strengths and our weaknesses. This is why we are the sole designers of this plan. We have been working from an old plan and working to develop an new plan for network and computer upgrades, along with communication equipment and communication network design.
Needs Assessment
The needs expressed within this document are from taking inventory of current network and communication models and finding bottlenecks within them. Some of the items herein were born out of the fact that technology advances will allow us to do the things we already do with more efficiency. Others, from the standpoint that technology will allow us to do things we could never do before, where still other items fall into the category of ideas that were completely foreign, but may very well revolutionize the way we do things.
Evaluation
This plan will be revisited on a yearly basis for three years. At that time we will evaluate how much closer we are to completion and how effective these items have been for that year. Each year will also bring some minor revisions, adjustments and appendixes to the plan. With technology being the ever-changing landscape that it is, this plan may even be revamped during these evaluations to reflect the growth of new and better technology.
While every effort will be made to accomplish these goals, budgets restraints may keep us from reaching our goals in the timeline allotted. Any item that is relying on e-rate funding (USF) will be pending until we receive approval for those items. Every effort will be made to file for funding and use the money we have at the most efficient level we can to accomplish our goals.
Goals for this plan broken down by category:
Local Voice – Increase phone line availability, and usability.
Long Distance Voice – Decrease cost of long distance while increasing availability.
Cellular Service – Utilize cellular networks for communication where it will reduce costs.
Internet Connectivity – Maintain high-speed fiber-optic connectivity between buildings
Intra-District Phone Service – Enhance phone system with new features, integrate intra-district phone with data network, enable direct dialing to other schools in the district, and enable voice mail
LAN/WAN – Increase availability and bandwidth within the district, including more wiring drops, wireless access, faster links where applicable
Servers and Terminal Services – Update older servers, use terminal services where needed to make use of older hardware to extend life of aging computers
Licensing – Make sure we are up to date on all licensing including past and present purchases
Maintenance – Obtain Maintenance agreement on Network Hardware
Professional Development Strategy broken down by category
Local Voice – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Long Distance Voice – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Cellular Service – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Internet Connectivity – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Intra-district Phone Service – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
LAN/WAN – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Servers and Terminal Services – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Licensing – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Maintenance – Train staff on use of existing and new features, also addressing ethical use of school resources, utilizing district as well as school-level personnel
Needs Assessment broken down by category
Local Voice – We reviewed current status and usage to determine that we were paying a lot, but not getting maximum usage for our lines. Many lines are unused most of the day, while others are constantly busy
Long Distance Voice – Lines are highly available in some places, while not available in others
Cellular Service – We currently use a few cellular phones, and wide availability may reduce costs rather than use of radios in certain instances
Internet Connectivity – We lease managed fiber for part of our data backbone. We need to maintain these links for connectivity
Intra-district Phone Service – Phone calls between schools are often halted because of unavailability of phone lines. Integrating our Intra-district phone structure with our data network will allow us to dial from school to school without the need to access an outside line, Voice mail will increase use of communication
LAN/WAN – Upgrading links and availability will decrease frustration in finding a physical location in which to connect to the network, increasing speed of some of these links will aid in smooth flow of data
Servers and Terminal Services – With technology being an ever-changing landscape, obsolescence in inevitable. What this leaves behind is lots of unusable machines that are impossible to get rid of. Using terminal services, we can use these machines far beyond their normal lifespan. Aging servers need to be updated.
Licensing – For just about everything you do with technology, you must be licensed. We need to ensure that whatever we use, we pay for. We are currently reviewing everything we use and will use in the future so we can be compliant with licensing rules
Maintenance – Things break. We need to be ready for this by having maintenance contracts in place in case of emergency
Sufficient Budget broken down by category
Local Voice – Approx. $30,000 has been allotted of Local and e-rate funds to cover costs
Long Distance Voice – Approx. $12,000 has been allotted of Local and e-rate funds to cover costs
Cellular Service – Approx. $9,600 has been allotted of Local and e-rate funds to cover costs
Internet Connectivity – Approx. $26,100 has been allotted of Local and e-rate funds to cover costs
Intra-district Phone Service – Approx. $65,000 has been allotted of Local and e-rate funds to cover costs
LAN/WAN – Approx. $235,400 has been allotted of Local and e-rate funds to cover costs
Servers and Terminal Services – Approx. $35,800 has been allotted of Local and e-rate funds to cover costs
Licensing – Approx. $28,000 has been allotted of Local and e-rate funds to cover costs
Maintenance – Approx. $50,000 has been allotted of Local and e-rate funds to cover costs
Plan Evaluation broken down by category
Local Voice – Survey staff to find out if line availability is sufficient, add more lines if necessary
Long Distance Voice – Survey staff to find out if line availability is sufficient, add more lines if necessary
Cellular Service – Monitor usage and compare to see if service is being utilized efficiently
Internet Connectivity – Monitor usage, chart bandwidth usage, watch for peaks
Intra-district Phone Service – Survey staff about increased availability and ease of use
LAN/WAN – Monitor bandwidth; perform site surveys to insure availability
Servers and Terminal Services – Survey users about usability, monitor usage
Licensing – Revisit yearly to ensure compliance
Maintenance – Compare cost of maintenance to actual cost of hardware replacement
Action Component __Communications_________ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Priority Need |
Goal(s) (Addresses the Priority Need) |
Increase communication efficiency, security, and safety |
|
Causes and Contributing Factors (Assessment) |
Objectives with Measures of Success |
There is limited communication availability both internally and externally. Phone lines are a limiting factor. |
|
Action Component __Communications_________ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
1 |
Integrate the phone network into the IP network. |
Phone line availability will increase. Incoming phone lines would be free for external communications |
Lamar Miller |
7/1/05 |
6/30/09 |
See Appendix A, item 1 |
Technology, USF, General Fund |
2 |
Integrate advanced phone services into the telephone network |
Communication with the staff, parents, and outside agencies will be enhanced. Staff will be more effective in their communications. |
Lamar Miller |
7/1/05 |
6/30/09 |
See Appendix A, item 2 |
Technology, USF, General Fund |
3 |
Purchase cellular phones where necessary to enhance communications and to replace two- way radios where it is cost effective. |
Cost of communications will decrease. |
Lamar Miller |
7/1/05 |
6/30/09 |
See Appendix A, item 3 |
Technology, USF, General Fund |
4 |
Incorporate a new district web server. |
Speed timely delivery of web based content |
Lamar Miller Brent Norris |
7/1/05 |
6/30/09 |
See Appendix B, item 1 |
Technology, USF, General Fund |
4 |
Update the usability of the district web site for data dissemination and intra-district communication. |
Allow users to effectively use web based content |
Brent Norris |
7/1/05 |
6/30/09 |
1 hour weekly of Assistant Technology Coordinator |
General Fund |
5 |
Provide professional development on use and ethics of communications network equipment. |
Users will fully utilize the capabilities of the communications resources available to them |
Lamar Miller Brent Norris Alex Fitzpatrick |
7/1/05 |
6/30/09 |
PD Time |
PD funds |
Action Component __Network Availability_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Priority Need |
Goal(s) (Addresses the Priority Need) |
Increase network availability and efficiency |
|
Causes and Contributing Factors (Assessment) |
Objectives with Measures of Success |
Some current network resources are nearing their capacity and do not provide for continued growth. Other resources are not consistent throughout the network and provide for inequitable network allocation. There are no current provisions for equipment failure and maintenance. Users do not have the technical expertise to most effectively use network resources. The current network does not provide for remote access. |
|
Action Component __Network Availability_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
1 |
Purchase new web and proxy servers |
Capacity and usability of internet and intranet will increase |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 1 |
Technology, USF, General Fund |
2 |
Purchase new UPS systems for servers, phone and data switches |
Up-time of network components will ensure availability of telephone and computer network during power outages |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 2 |
Technology, USF, General Fund |
3 |
Purchase and install wireless access devices and network cards |
Users will be able to connect to network using wireless technology |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 3 |
Technology, USF, General Fund |
4 |
Install more data drops and switches in buildings |
Users will be able to connect to network in more locations throughout the building |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 4 |
Technology, USF, General Fund |
5 |
Install more gigabit drops and switches in buildings |
Users will be able to connect to network in more locations at 1000mb |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 5 |
Technology, USF, General Fund |
6 |
Purchase high speed wireless access points for buildings using wireless for connectivity |
Buildings currently connecting at 11mb/sec will connect at 54mb/sec or higher |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 6 |
Technology, USF, General Fund |
7 |
Provide redundancy in internet connection |
Reduce non-availability of internet resources |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 7 |
Technology, USF, General Fund |
8 |
Implement remote access equipment and procedures for network users |
Enhance resource availability and provide for off-site access |
Lamar Miller Brent Norris |
07/01/05 |
06-30-09 |
See Appendix B Item 8 |
Technology, USF, General Fund |
Action Component __Network Availability_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
9 |
Maintain current high speed inter-building fiber optic connectivity |
Connectivity will continue to occur at an enhanced level allowing consolidation of network resources |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 9 |
Technology, USF, General Fund |
10 |
Maintain current high speed connectivity with the state network |
Connectivity will continue to occur at an enhanced level allowing bandwidth intensive applications to be used. |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix B Item 10 |
Technology, USF, General Fund |
11 |
Provide Professional development on the effective use of network resources |
Network users will be able to fully utilize the network resources available to them |
Lamar Miller Brent Norris Alex Fitzpatrick |
07/01/05 |
06-30-09 |
PD Time |
PD Funds |
Action Component __Resource Utilization_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Priority Need |
Goal(s) (Addresses the Priority Need) |
Increase resource utilization and efficiency |
|
Causes and Contributing Factors (Assessment) |
Objectives with Measures of Success |
With current budget constraints, there is limited money to replace older equipment. We need to extend the life of the equipment we currently own, as well as train the users to utilize the resources that we already have. |
|
Action Component __Resource Utilization_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
1 |
Purchase new terminal servers, Network OS licenses, Client Access licenses |
Total number of terminal connections available to users will increase |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix C Item 1 |
Technology, USF, General Fund |
2 |
Purchase Network Interface Cards for terminals |
Total number of usable network computers will increase |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix C Item 2 |
Technology, USF, General Fund |
3 |
Purchase secondary power supply and gigabit copper blade for Passport 8603 routing switch |
Reliability and bandwidth of main routing switch will be increased |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix C Item 3 |
Technology, USF, General Fund |
4 |
Obtain maintenance contract for phone switches |
Reliability of phone switches will be guaranteed |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix C Item 4 |
Technology, USF, General Fund |
4 |
Obtain maintenance contract for Passport 8603 |
Reliability of main routing switch will be guaranteed |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix C Item 5 |
Technology, USF, General Fund |
5 |
Provide Professional Development on the effective use of current hardware and software |
Computer users will better utilize technology that is already available to them |
Lamar Miller Brent Norris Alex Fitzpatrick |
07/01/05 |
06-30-09 |
PD Time |
PD funds |
Action Component __Software Compliance_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Priority Need |
Goal(s) (Addresses the Priority Need) |
Guarantee software licensing compliance |
|
Causes and Contributing Factors (Assessment) |
Objectives with Measures of Success |
Since technology is ever changing, staying up to date on software licensing is very challenging. Computers get added, servers get upgraded, and more users are utilizing network resources. |
|
Action Component __Software Compliance_______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
1 |
Review software purchases and see where we may need to purchase licenses |
We will know specifically where we fall short as far as licensing |
Lamar Miller |
07/01/05 |
06-30-09 |
Approx 40 hrs. DTC time / year |
General Fund |
2 |
Purchase Windows Server licenses for needed servers |
Software licensing will be guaranteed for Server NOS |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 1 |
Technology, USF, General Fund |
3 |
Purchase Windows Client Access Licenses for all devices |
Software licensing will be guaranteed for Network CAL |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 2 |
Technology, USF, General Fund |
4 |
Purchase Exchange Client Access Licenses for all users |
Software licensing will be guaranteed for email CAL |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 3 |
Technology, USF, General Fund |
5 |
Purchase Windows workstation OS licenses for upgraded workstations |
Software licensing will be guaranteed for workstation OS |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 4 |
Technology, General Fund |
6 |
Purchase server software licenses for programs that run on the servers |
Software licensing will be guaranteed for Server applications |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 5 |
Technology, General Fund |
7 |
Purchase McAfee anti-virus licenses for workstations and servers beyond what is paid for by KDE |
Software licensing will be guaranteed for Anti-Virus software |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 6 |
Technology, General Fund |
8 |
Purchase licenses for end-user software |
Software licensing for end-user applications will be guaranteed |
Lamar Miller |
07/01/05 |
06-30-09 |
See Appendix D Item 7 |
Technology, General Fund |
Action Component __Audio/Visual _______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Priority Need |
Goal(s) (Addresses the Priority Need) |
Increase usage of network for delivery of audio and video for educational purposes |
|
Causes and Contributing Factors (Assessment) |
Objectives with Measures of Success |
Users are wanting delivery of more audio and video for educational purposes. With the internet and networks in general being a robust means for delivery of information, we see this as a natural progression for integration of AV into the computer network. |
|
Action Component __Audio/Visual _______ Date ___January 14,2005________
District Name ___Edmonson County Schools__________ Component Manager ___Lamar Miller________________
Strategies/Activities (Activity or Strategic Sequence of Activities to Achieve Objectives)
Objective Label |
Strategy/Activity |
Expected Impact in Terms of District Effectiveness |
Responsible Person |
Start Date |
End Date |
Resources Needed |
Fund Source |
1 |
Acquire equipment to deliver video services to classroom utilizing existing network |
Classrooms will have access to more content |
Lamar Miller |
07/01/05 |
06/30/09 |
See Appendix E Item 1 |
General Fund, USF |
Appendix A Items
-
Costs for hardware to incorporate the phone switches onto the network are not currently known as we do not know as of yet what all this will entail. We know that VoIP gateways and devices for consolidating phone lines will be needed.
-
Voice Mail system will probably be in the range of $15,000-$20,000 one time set up. Long distance charges are currently approx $25,000/year. Ways to reduce these cost by obtaining a different plan or by other means will be sought out.
-
Approx 20-30 cellular phones at approx $40/month each
Appendix B Items
-
Server hardware approx $5000 each, Operating System and software to run web pages, proxy software, $1000
-
UPS of at least 1500VA, approx $600-$1000 each
-
Wireless access points are approx $275 each, and wireless NICs are approx $100 each
-
Estimated costs of wiring up to $25,000 per building, 48-port gigabit switches approx $3600
-
48-port gigabit switches are approx $3600
-
Wireless access points are approx $275 each
-
Costs are unknown, but should not exceed $650/month
-
Costs are unknown but should not exceed $5000
-
Current costs are $3048/ month
-
Costs are unknown, but should not exceed $650/month
Appendix C Items
-
Server hardware approx $5000 each, Operating system approx $100, TS CAL’s approx $25 each
-
Network Interface Cards range from $25-50 each
-
Power Supply for routing switch is approx $800, blade for routing switch is approx $9000
-
Estimates on these items are currently unknown
-
Estimates on these items are currently unknown
Appendix D Items
-
Windows Server OS approx $100 each
-
Windows Server CALs approx $5.50 each
-
Microsoft Exchange CALs approx $2.50 each
-
Windows XP license approx $50
-
These costs will vary depending on publisher
-
McAfee Enterprise nodes are approx $3 each
-
These costs will vary depending on publisher
Appendix E Items
-
Estimates on these items are currently unknown